US 84 over Navasota River E Relief
FairLimestone County, Texas · 9.60 MI W of SH 14 · Structure no. 091470005603037
- Built
- 1940
- 85 years old, rebuilt 1962
- Condition
- Fair
- inspected November 2024
- Type
- Tee Beam
- Concrete
- Length
- 150 ft
- 5 main spans
- Daily traffic
- 3,978
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
US 84 over Navasota River E Relief is a concrete tee beam carrying US 84 over Navasota River E Relief in Limestone County, Texas. It was built in 1940 and reconstructed in 1962, so it is 85 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,978 vehicles a day, roughly 15% of them trucks, projected to reach 5,010 by 2038. The structure is 150 ft (45.7 m) long and 44 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 84 over Navasota River E Relief built?
It was built in 1940, making it 85 years old in 2025. It was reconstructed in 1962.
What condition is US 84 over Navasota River E Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does US 84 over Navasota River E Relief carry?
About 3,978 vehicles per day (2023 count), of which roughly 15% are trucks.
How long is US 84 over Navasota River E Relief?
The structure is 150 ft (45.7 m) long with a longest span of 30 ft (9.1 m) and a deck 44 ft wide.
Who owns US 84 over Navasota River E Relief?
It is owned by the State Highway Agency.