US Bridges

SH 105 over Tarkington Bayou Relief

Good

Liberty County, Texas · 3.1 MI SE of US 59 · Structure no. 201460059301010

Built
1966
59 years old, rebuilt 2017
Condition
Good
inspected March 2024
Type
Culvert
Concrete
Length
22 ft
3 main spans
Daily traffic
8,521
2022 count
Owner
State
State Highway Agency

About this bridge

SH 105 over Tarkington Bayou Relief is a concrete culvert carrying SH 105 over Tarkington Bayou Relief in Liberty County, Texas. It was built in 1966 and reconstructed in 2017, so it is 59 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,521 vehicles a day, roughly 16% of them trucks, projected to reach 17,640 by 2031. The structure is 22 ft (6.8 m) long and 73 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesSH 105
CrossesTarkington Bayou Relief
Location3.1 MI SE of US 59
RouteState Highway 105
StateTexas
Coordinates30.32285, -95.04569
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length22 ft (6.8 m)
Longest span7 ft (2.1 m)
Deck width73 ft (22.3 m)
Roadway width65 ft (19.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,521 (2022)
Projected traffic17,640 by 2031
Trucks16%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 105 over Tarkington Bayou Relief built?

It was built in 1966, making it 59 years old in 2025. It was reconstructed in 2017.

What condition is SH 105 over Tarkington Bayou Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does SH 105 over Tarkington Bayou Relief carry?

About 8,521 vehicles per day (2022 count), of which roughly 16% are trucks.

How long is SH 105 over Tarkington Bayou Relief?

The structure is 22 ft (6.8 m) long with a longest span of 7 ft (2.1 m) and a deck 73 ft wide.

Who owns SH 105 over Tarkington Bayou Relief?

It is owned by the State Highway Agency.