FM 2684 over Draw

Fair

Liberty County, Texas · 0.4 MI S of US 90 · Structure no. 201460038804019

Built
1963
62 years old
Condition
Fair
inspected April 2024
Type
Stringer/Multi-beam or Girder
Concrete
Length
120 ft
3 main spans
Daily traffic
916
2022 count
Owner
State
State Highway Agency

About this bridge

FM 2684 over Draw is a concrete stringer/multi-beam or girder carrying FM 2684 over Draw in Liberty County, Texas. It was built in 1963, so it is 62 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 916 vehicles a day, roughly 23% of them trucks, projected to reach 3,030 by 2033. The structure is 120 ft (36.6 m) long and 31 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFM 2684
CrossesDraw
Location0.4 MI S of US 90
RouteState Highway 2684
StateTexas
Coordinates30.04951, -94.79479
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56 US tons
Inventory rating34 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadH 20
Structure length120 ft (36.6 m)
Longest span39 ft (11.9 m)
Deck width31 ft (9.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic916 (2022)
Projected traffic3,030 by 2033
Trucks23%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 2684 over Draw built?

It was built in 1963, making it 62 years old in 2025.

What condition is FM 2684 over Draw in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does FM 2684 over Draw carry?

About 916 vehicles per day (2022 count), of which roughly 23% are trucks.

How long is FM 2684 over Draw?

The structure is 120 ft (36.6 m) long with a longest span of 39 ft (11.9 m) and a deck 31 ft wide.

Who owns FM 2684 over Draw?

It is owned by the State Highway Agency.