CR 125 over Cedar Creek Relief
GoodLee County, Texas · 1.05 MI SE of FM 180 · Structure no. 141440AA0125005
- Built
- 1961
- 64 years old
- Condition
- Good
- inspected January 2024
- Type
- Culvert
- Concrete
- Length
- 23 ft
- 3 main spans
- Daily traffic
- 84
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
CR 125 over Cedar Creek Relief is a concrete culvert carrying CR 125 over Cedar Creek Relief in Lee County, Texas. It was built in 1961, so it is 64 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 84 vehicles a day, roughly 3% of them trucks, projected to reach 84 by 2042. The structure is 23 ft (7 m) long and 33 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 125 over Cedar Creek Relief built?
It was built in 1961, making it 64 years old in 2025.
What condition is CR 125 over Cedar Creek Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does CR 125 over Cedar Creek Relief carry?
About 84 vehicles per day (2020 count), of which roughly 3% are trucks.
How long is CR 125 over Cedar Creek Relief?
The structure is 23 ft (7 m) long with a longest span of 7 ft (2.1 m) and a deck 33 ft wide.
Who owns CR 125 over Cedar Creek Relief?
It is owned by the County Highway Agency.