US Bridges

CR 124 over Navidad River

Good

Lavaca County, Texas · 0.8 MI NE of FM 530 · Structure no. 131430AA0124001

Built
2015
10 years old
Condition
Good
inspected January 2024
Type
Slab
Prestressed Concrete
Length
150 ft
3 main spans
Daily traffic
100
2017 count
Owner
County
County Highway Agency

About this bridge

CR 124 over Navidad River is a prestressed concrete slab carrying CR 124 over Navidad River in Lavaca County, Texas. It was built in 2015, so it is 10 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, projected to reach 100 by 2032. The structure is 150 ft (45.7 m) long and 30 ft wide. If it were closed, the detour would be 21.1 mi (34 km).

CarriesCR 124
CrossesNavidad River
Location0.8 MI NE of FM 530
RouteCounty Highway 124
StateTexas
Coordinates29.38239, -96.77939
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length150 ft (45.7 m)
Longest span50 ft (15.2 m)
Deck width30 ft (9.2 m)
Roadway width28 ft (8.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2017)
Projected traffic100 by 2032
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed21.1 mi (34 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was CR 124 over Navidad River built?

It was built in 2015, making it 10 years old in 2025.

What condition is CR 124 over Navidad River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does CR 124 over Navidad River carry?

About 100 vehicles per day (2017 count).

How long is CR 124 over Navidad River?

The structure is 150 ft (45.7 m) long with a longest span of 50 ft (15.2 m) and a deck 30 ft wide.

Who owns CR 124 over Navidad River?

It is owned by the County Highway Agency.