US Bridges

FM 957 over Lavaca River Trib

Good

Lavaca County, Texas · 4.20 MI S of FM 532 · Structure no. 131430051506113

Built
2008
17 years old
Condition
Good
inspected February 2023
Type
Culvert
Concrete
Length
30 ft
2 main spans
Daily traffic
690
2020 count
Owner
State
State Highway Agency

About this bridge

FM 957 over Lavaca River Trib is a concrete culvert carrying FM 957 over Lavaca River Trib in Lavaca County, Texas. It was built in 2008, so it is 17 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 690 vehicles a day, roughly 15% of them trucks, projected to reach 980 by 2038. The structure is 30 ft (9.1 m) long and 42 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesFM 957
CrossesLavaca River Trib
Location4.20 MI S of FM 532
RouteState Highway 957
StateTexas
Coordinates29.51348, -96.99025
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length30 ft (9.1 m)
Longest span12 ft (3.7 m)
Deck width42 ft (12.9 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic690 (2020)
Projected traffic980 by 2038
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 957 over Lavaca River Trib built?

It was built in 2008, making it 17 years old in 2025.

What condition is FM 957 over Lavaca River Trib in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does FM 957 over Lavaca River Trib carry?

About 690 vehicles per day (2020 count), of which roughly 15% are trucks.

How long is FM 957 over Lavaca River Trib?

The structure is 30 ft (9.1 m) long with a longest span of 12 ft (3.7 m) and a deck 42 ft wide.

Who owns FM 957 over Lavaca River Trib?

It is owned by the State Highway Agency.