El Jardin RD over Frio River
GoodLa Salle County, Texas · 8.20 MI W of SH 97 · Structure no. 221420AA0051101
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 120 ft
- 1 main span
- Daily traffic
- 1,024
- 2013 count
- Owner
- County
- County Highway Agency
About this bridge
El Jardin RD over Frio River is a prestressed concrete stringer/multi-beam or girder carrying El Jardin RD over Frio River in La Salle County, Texas. It was built in 2023, so it is 2 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,024 vehicles a day, projected to reach 300 by 2035. The structure is 120 ft (36.6 m) long and 30 ft wide. If it were closed, the detour would be 11.2 mi (18 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was El Jardin RD over Frio River built?
It was built in 2023, making it 2 years old in 2025.
What condition is El Jardin RD over Frio River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does El Jardin RD over Frio River carry?
About 1,024 vehicles per day (2013 count).
How long is El Jardin RD over Frio River?
The structure is 120 ft (36.6 m) long with a longest span of 120 ft (36.6 m) and a deck 30 ft wide.
Who owns El Jardin RD over Frio River?
It is owned by the County Highway Agency.