US Bridges

Market ST over Cane Creek

Good

Lamar County, Texas · 0.1 MI W of FM 38 · Structure no. 011390E00055002

Built
2017
8 years old
Condition
Good
inspected November 2023
Type
Slab
Prestressed Concrete
Length
120 ft
3 main spans
Daily traffic
150
2010 count
Owner
City
City or Municipal Highway Agency

About this bridge

Market ST over Cane Creek is a prestressed concrete slab carrying Market ST over Cane Creek in Lamar County, Texas. It was built in 2017, so it is 8 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 150 vehicles a day, projected to reach 160 by 2030. The structure is 120 ft (36.6 m) long and 26 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesMarket ST
CrossesCane Creek
Location0.1 MI W of FM 38
RouteCity Street 0
StateTexas
Coordinates33.55342, -95.72334
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length120 ft (36.6 m)
Longest span40 ft (12.2 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic150 (2010)
Projected traffic160 by 2030
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Market ST over Cane Creek built?

It was built in 2017, making it 8 years old in 2025.

What condition is Market ST over Cane Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Market ST over Cane Creek carry?

About 150 vehicles per day (2010 count).

How long is Market ST over Cane Creek?

The structure is 120 ft (36.6 m) long with a longest span of 40 ft (12.2 m) and a deck 26 ft wide.

Who owns Market ST over Cane Creek?

It is owned by the City or Municipal Highway Agency.