FM 195 over Six Mile Creek Relief
FairLamar County, Texas · 3.8 MI NE of US 82 · Structure no. 011390073002014
- Built
- 1954
- 71 years old, rebuilt 1978
- Condition
- Fair
- inspected December 2024
- Type
- Slab
- Concrete
- Length
- 100 ft
- 4 main spans
- Daily traffic
- 4,518
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
FM 195 over Six Mile Creek Relief is a concrete slab carrying FM 195 over Six Mile Creek Relief in Lamar County, Texas. It was built in 1954 and reconstructed in 1978, so it is 71 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,518 vehicles a day, roughly 16% of them trucks, projected to reach 6,170 by 2039. The structure is 100 ft (30.5 m) long and 46 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 195 over Six Mile Creek Relief built?
It was built in 1954, making it 71 years old in 2025. It was reconstructed in 1978.
What condition is FM 195 over Six Mile Creek Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does FM 195 over Six Mile Creek Relief carry?
About 4,518 vehicles per day (2023 count), of which roughly 16% are trucks.
How long is FM 195 over Six Mile Creek Relief?
The structure is 100 ft (30.5 m) long with a longest span of 25 ft (7.6 m) and a deck 46 ft wide.
Who owns FM 195 over Six Mile Creek Relief?
It is owned by the State Highway Agency.