US Bridges

Center Point DR over Verde Creek

Fair

Kerr County, Texas · 0.5 MI SE of FM 1350 · Structure no. 151330AA0329001

Built
1975
50 years old
Condition
Fair
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
56 ft
1 main span
Daily traffic
279
2020 count
Owner
County
County Highway Agency

About this bridge

Center Point DR over Verde Creek is a prestressed concrete stringer/multi-beam or girder carrying Center Point DR over Verde Creek in Kerr County, Texas. It was built in 1975, so it is 50 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 279 vehicles a day, projected to reach 225 by 2032. The structure is 56 ft (17.1 m) long and 22 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesCenter Point DR
CrossesVerde Creek
Location0.5 MI SE of FM 1350
RouteCounty Highway 0
StateTexas
Coordinates29.9346, -99.00734
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length56 ft (17.1 m)
Longest span53 ft (16.2 m)
Deck width22 ft (6.6 m)
Roadway width19 ft (5.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic279 (2020)
Projected traffic225 by 2032
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$3,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Center Point DR over Verde Creek built?

It was built in 1975, making it 50 years old in 2025.

What condition is Center Point DR over Verde Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does Center Point DR over Verde Creek carry?

About 279 vehicles per day (2020 count).

How long is Center Point DR over Verde Creek?

The structure is 56 ft (17.1 m) long with a longest span of 53 ft (16.2 m) and a deck 22 ft wide.

Who owns Center Point DR over Verde Creek?

It is owned by the County Highway Agency.