US Bridges

US 175 WB over Cedar Creek Relief #2

Good

Kaufman County, Texas · 2.62 MI SE of SH 274 · Structure no. 181300019705230

Built
1989
36 years old
Condition
Good
inspected January 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
120 ft
2 main spans
Daily traffic
7,617
2020 count
Owner
State
State Highway Agency

About this bridge

US 175 WB over Cedar Creek Relief #2 is a prestressed concrete stringer/multi-beam or girder carrying US 175 WB over Cedar Creek Relief #2 in Kaufman County, Texas. It was built in 1989, so it is 36 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,617 vehicles a day, roughly 8% of them trucks, projected to reach 11,145 by 2035. The structure is 120 ft (36.6 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 175 WB
CrossesCedar Creek Relief #2
Location2.62 MI SE of SH 274
RouteU.S. Route 175
StateTexas
Coordinates32.41075, -96.18476
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length120 ft (36.6 m)
Longest span60 ft (18.3 m)
Deck width40 ft (12.2 m)
Roadway width37 ft (11.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,617 (2020)
Projected traffic11,145 by 2035
Trucks8%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 175 WB over Cedar Creek Relief #2 built?

It was built in 1989, making it 36 years old in 2025.

What condition is US 175 WB over Cedar Creek Relief #2 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does US 175 WB over Cedar Creek Relief #2 carry?

About 7,617 vehicles per day (2020 count), of which roughly 8% are trucks.

How long is US 175 WB over Cedar Creek Relief #2?

The structure is 120 ft (36.6 m) long with a longest span of 60 ft (18.3 m) and a deck 40 ft wide.

Who owns US 175 WB over Cedar Creek Relief #2?

It is owned by the State Highway Agency.