US 80 Wbml over E Fork Trinity Relief #1
GoodKaufman County, Texas · 0.7 MI E of Dallas CO · Structure no. 181300009503420
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 300 ft
- 3 main spans
- Daily traffic
- 87,026
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
US 80 Wbml over E Fork Trinity Relief #1 is a prestressed concrete stringer/multi-beam or girder carrying US 80 Wbml over E Fork Trinity Relief #1 in Kaufman County, Texas. It was built in 2024, so it is 1 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 87,026 vehicles a day, roughly 11% of them trucks, projected to reach 121,836 by 2042. The structure is 300 ft (91.4 m) long and 51 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 80 Wbml over E Fork Trinity Relief #1 built?
It was built in 2024, making it 1 years old in 2025.
What condition is US 80 Wbml over E Fork Trinity Relief #1 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does US 80 Wbml over E Fork Trinity Relief #1 carry?
About 87,026 vehicles per day (2023 count), of which roughly 11% are trucks.
How long is US 80 Wbml over E Fork Trinity Relief #1?
The structure is 300 ft (91.4 m) long with a longest span of 110 ft (33.5 m) and a deck 51 ft wide.
Who owns US 80 Wbml over E Fork Trinity Relief #1?
It is owned by the State Highway Agency.