CR 604 - Pct 3 over Walnut Creek
FairJohnson County, Texas · 0.2 MI S FM 917 Happy Hil · Structure no. 021270AA0577001
- Built
- 1998
- 27 years old
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 88 ft
- 2 main spans
- Daily traffic
- 540
- 2016 count
- Owner
- County
- County Highway Agency
About this bridge
CR 604 - Pct 3 over Walnut Creek is a steel continuous stringer/multi-beam or girder carrying CR 604 - Pct 3 over Walnut Creek in Johnson County, Texas. It was built in 1998, so it is 27 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 540 vehicles a day, roughly 1% of them trucks, projected to reach 590 by 2036. The structure is 88 ft (26.8 m) long and 24 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 604 - Pct 3 over Walnut Creek built?
It was built in 1998, making it 27 years old in 2025.
What condition is CR 604 - Pct 3 over Walnut Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does CR 604 - Pct 3 over Walnut Creek carry?
About 540 vehicles per day (2016 count), of which roughly 1% are trucks.
How long is CR 604 - Pct 3 over Walnut Creek?
The structure is 88 ft (26.8 m) long with a longest span of 49 ft (14.9 m) and a deck 24 ft wide.
Who owns CR 604 - Pct 3 over Walnut Creek?
It is owned by the County Highway Agency.