CR 608 - Pct 3 over Walnut Creek Branch
FairJohnson County, Texas · 1.9 MI N of FM 917 · Structure no. 021270AA0510001
- Built
- 1995
- 30 years old
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 82 ft
- 2 main spans
- Daily traffic
- 341
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
CR 608 - Pct 3 over Walnut Creek Branch is a steel continuous stringer/multi-beam or girder carrying CR 608 - Pct 3 over Walnut Creek Branch in Johnson County, Texas. It was built in 1995, so it is 30 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 341 vehicles a day, projected to reach 300 by 2030. The structure is 82 ft (25 m) long and 24 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 608 - Pct 3 over Walnut Creek Branch built?
It was built in 1995, making it 30 years old in 2025.
What condition is CR 608 - Pct 3 over Walnut Creek Branch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does CR 608 - Pct 3 over Walnut Creek Branch carry?
About 341 vehicles per day (2024 count).
How long is CR 608 - Pct 3 over Walnut Creek Branch?
The structure is 82 ft (25 m) long with a longest span of 42 ft (12.8 m) and a deck 24 ft wide.
Who owns CR 608 - Pct 3 over Walnut Creek Branch?
It is owned by the County Highway Agency.