Pine ST over N Butane DR Drain Ditch
GoodJefferson County, Texas · 0.04 MI N of FM 366 · Structure no. 201240F00335001
- Built
- 1984
- 41 years old
- Condition
- Good
- inspected July 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 90 ft
- 1 main span
- Daily traffic
- 537
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Pine ST over N Butane DR Drain Ditch is a prestressed concrete box beam or girders - multiple carrying Pine ST over N Butane DR Drain Ditch in Jefferson County, Texas. It was built in 1984, so it is 41 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 537 vehicles a day, roughly 1% of them trucks, projected to reach 730 by 2035. The structure is 90 ft (27.4 m) long and 36 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pine ST over N Butane DR Drain Ditch built?
It was built in 1984, making it 41 years old in 2025.
What condition is Pine ST over N Butane DR Drain Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does Pine ST over N Butane DR Drain Ditch carry?
About 537 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is Pine ST over N Butane DR Drain Ditch?
The structure is 90 ft (27.4 m) long with a longest span of 90 ft (27.4 m) and a deck 36 ft wide.
Who owns Pine ST over N Butane DR Drain Ditch?
It is owned by the City or Municipal Highway Agency.