75th ST NB over Main B Canal
FairJefferson County, Texas · 1.2 MI NE of US 69 · Structure no. 201240C01790011
- Built
- 1981
- 44 years old
- Condition
- Fair
- inspected July 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 90 ft
- 3 main spans
- Daily traffic
- 12,930
- 2015 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
75th ST NB over Main B Canal is a prestressed concrete box beam or girders - multiple carrying 75th ST NB over Main B Canal in Jefferson County, Texas. It was built in 1981, so it is 44 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 12,930 vehicles a day, projected to reach 12,930 by 2035. The structure is 90 ft (27.4 m) long and 32 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 75th ST NB over Main B Canal built?
It was built in 1981, making it 44 years old in 2025.
What condition is 75th ST NB over Main B Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does 75th ST NB over Main B Canal carry?
About 12,930 vehicles per day (2015 count).
How long is 75th ST NB over Main B Canal?
The structure is 90 ft (27.4 m) long with a longest span of 30 ft (9.1 m) and a deck 32 ft wide.
Who owns 75th ST NB over Main B Canal?
It is owned by the City or Municipal Highway Agency.