Turtle Creek DR SB over 9th Ave Ditch
GoodJefferson County, Texas · 0.5 MI NE of US 67 · Structure no. 201240C01351002
- Built
- 1981
- 44 years old
- Condition
- Good
- inspected June 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 50 ft
- 1 main span
- Daily traffic
- 2,591
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Turtle Creek DR SB over 9th Ave Ditch is a prestressed concrete box beam or girders - multiple carrying Turtle Creek DR SB over 9th Ave Ditch in Jefferson County, Texas. It was built in 1981, so it is 44 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,591 vehicles a day, roughly 3% of them trucks, projected to reach 3,627 by 2039. The structure is 50 ft (15.2 m) long and 32 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Turtle Creek DR SB over 9th Ave Ditch built?
It was built in 1981, making it 44 years old in 2025.
What condition is Turtle Creek DR SB over 9th Ave Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does Turtle Creek DR SB over 9th Ave Ditch carry?
About 2,591 vehicles per day (2019 count), of which roughly 3% are trucks.
How long is Turtle Creek DR SB over 9th Ave Ditch?
The structure is 50 ft (15.2 m) long with a longest span of 50 ft (15.2 m) and a deck 32 ft wide.
Who owns Turtle Creek DR SB over 9th Ave Ditch?
It is owned by the City or Municipal Highway Agency.