US Bridges

US 90 EB over Cheek Canal

Fair

Jefferson County, Texas · 2.7 MI W of FM 364 · Structure no. 201240002806138

Built
1966
59 years old
Condition
Fair
inspected May 2024
Type
Stringer/Multi-beam or Girder
Concrete
Length
61 ft
2 main spans
Daily traffic
7,069
2022 count
Owner
State
State Highway Agency

About this bridge

US 90 EB over Cheek Canal is a concrete stringer/multi-beam or girder carrying US 90 EB over Cheek Canal in Jefferson County, Texas. It was built in 1966, so it is 59 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 7,069 vehicles a day, roughly 9% of them trucks, projected to reach 12,209 by 2042. The structure is 61 ft (18.6 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 90 EB
CrossesCheek Canal
Location2.7 MI W of FM 364
RouteU.S. Route 90
StateTexas
Coordinates30.06141, -94.23329
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating67 US tons
Inventory rating40 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadH 20
Structure length61 ft (18.6 m)
Longest span30 ft (9.1 m)
Deck width42 ft (12.9 m)
Roadway width40 ft (12.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,069 (2022)
Projected traffic12,209 by 2042
Trucks9%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 90 EB over Cheek Canal built?

It was built in 1966, making it 59 years old in 2025.

What condition is US 90 EB over Cheek Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.

How much traffic does US 90 EB over Cheek Canal carry?

About 7,069 vehicles per day (2022 count), of which roughly 9% are trucks.

How long is US 90 EB over Cheek Canal?

The structure is 61 ft (18.6 m) long with a longest span of 30 ft (9.1 m) and a deck 42 ft wide.

Who owns US 90 EB over Cheek Canal?

It is owned by the State Highway Agency.