US Bridges

SH 118 over Jones Canyon Creek

Good

Jeff Davis County, Texas · 7.50 MI NW of SH 17 · Structure no. 241230041501014

Built
1975
50 years old
Condition
Good
inspected March 2023
Type
Slab
Concrete Continuous
Length
100 ft
4 main spans
Daily traffic
215
2020 count
Owner
State
State Highway Agency

About this bridge

SH 118 over Jones Canyon Creek is a concrete continuous slab carrying SH 118 over Jones Canyon Creek in Jeff Davis County, Texas. It was built in 1975, so it is 50 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 215 vehicles a day, roughly 20% of them trucks, projected to reach 270 by 2033. The structure is 100 ft (30.5 m) long and 42 ft wide. If it were closed, the detour would be 19.9 mi (32 km).

CarriesSH 118
CrossesJones Canyon Creek
Location7.50 MI NW of SH 17
RouteState Highway 118
StateTexas
Coordinates30.61145, -103.99729
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56 US tons
Inventory rating33 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length100 ft (30.5 m)
Longest span25 ft (7.6 m)
Deck width42 ft (12.8 m)
Roadway width40 ft (12.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic215 (2020)
Projected traffic270 by 2033
Trucks20%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed19.9 mi (32 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 118 over Jones Canyon Creek built?

It was built in 1975, making it 50 years old in 2025.

What condition is SH 118 over Jones Canyon Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does SH 118 over Jones Canyon Creek carry?

About 215 vehicles per day (2020 count), of which roughly 20% are trucks.

How long is SH 118 over Jones Canyon Creek?

The structure is 100 ft (30.5 m) long with a longest span of 25 ft (7.6 m) and a deck 42 ft wide.

Who owns SH 118 over Jones Canyon Creek?

It is owned by the State Highway Agency.