US Bridges

SH 17 over Frazier Canyon

Good

Jeff Davis County, Texas · 10.3 MI NE of SH 118 · Structure no. 241230010402065

Built
1994
31 years old
Condition
Good
inspected March 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
162 ft
2 main spans
Daily traffic
1,183
2019 count
Owner
State
State Highway Agency

About this bridge

SH 17 over Frazier Canyon is a prestressed concrete box beam or girders - multiple carrying SH 17 over Frazier Canyon in Jeff Davis County, Texas. It was built in 1994, so it is 31 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,183 vehicles a day, roughly 17% of them trucks, projected to reach 1,200 by 2033. The structure is 162 ft (49.4 m) long and 40 ft wide. If it were closed, the detour would be 44.7 mi (72 km).

CarriesSH 17
CrossesFrazier Canyon
Location10.3 MI NE of SH 118
RouteState Highway 17
StateTexas
Coordinates30.69134, -103.78997
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment7: Better than present minimum criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans2
Design loadHS 20
Structure length162 ft (49.4 m)
Longest span81 ft (24.7 m)
Deck width40 ft (12.3 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,183 (2019)
Projected traffic1,200 by 2033
Trucks17%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed44.7 mi (72 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 17 over Frazier Canyon built?

It was built in 1994, making it 31 years old in 2025.

What condition is SH 17 over Frazier Canyon in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does SH 17 over Frazier Canyon carry?

About 1,183 vehicles per day (2019 count), of which roughly 17% are trucks.

How long is SH 17 over Frazier Canyon?

The structure is 162 ft (49.4 m) long with a longest span of 81 ft (24.7 m) and a deck 40 ft wide.

Who owns SH 17 over Frazier Canyon?

It is owned by the State Highway Agency.