US Bridges

Manuel ST over Sandy Creek

Good

Jasper County, Texas · 0.1 MI S of FM 776 · Structure no. 201220B00282001

Built
2007
18 years old
Condition
Good
inspected May 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
90 ft
1 main span
Daily traffic
1,050
2015 count
Owner
City
City or Municipal Highway Agency

About this bridge

Manuel ST over Sandy Creek is a prestressed concrete box beam or girders - multiple carrying Manuel ST over Sandy Creek in Jasper County, Texas. It was built in 2007, so it is 18 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,050 vehicles a day, projected to reach 1,050 by 2035. The structure is 90 ft (27.4 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesManuel ST
CrossesSandy Creek
Location0.1 MI S of FM 776
RouteCity Street 516
StateTexas
Coordinates30.92284, -93.99079
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length90 ft (27.4 m)
Longest span90 ft (27.4 m)
Deck width40 ft (12.3 m)
Roadway width38 ft (11.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,050 (2015)
Projected traffic1,050 by 2035
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Manuel ST over Sandy Creek built?

It was built in 2007, making it 18 years old in 2025.

What condition is Manuel ST over Sandy Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Manuel ST over Sandy Creek carry?

About 1,050 vehicles per day (2015 count).

How long is Manuel ST over Sandy Creek?

The structure is 90 ft (27.4 m) long with a longest span of 90 ft (27.4 m) and a deck 40 ft wide.

Who owns Manuel ST over Sandy Creek?

It is owned by the City or Municipal Highway Agency.