FM 616 over Lavaca River East Relief
GoodJackson County, Texas · 3.0 MI E of FM 234 · Structure no. 131210049702026
- Built
- 2000
- 25 years old
- Condition
- Good
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,063 ft
- 12 main spans
- Daily traffic
- 2,666
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
FM 616 over Lavaca River East Relief is a prestressed concrete stringer/multi-beam or girder carrying FM 616 over Lavaca River East Relief in Jackson County, Texas. It was built in 2000, so it is 25 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,666 vehicles a day, roughly 16% of them trucks, projected to reach 2,260 by 2035. The structure is 1,063 ft (324 m) long and 45 ft wide. If it were closed, the detour would be 24.2 mi (39 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 616 over Lavaca River East Relief built?
It was built in 2000, making it 25 years old in 2025.
What condition is FM 616 over Lavaca River East Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does FM 616 over Lavaca River East Relief carry?
About 2,666 vehicles per day (2020 count), of which roughly 16% are trucks.
How long is FM 616 over Lavaca River East Relief?
The structure is 1,063 ft (324 m) long with a longest span of 89 ft (27.1 m) and a deck 45 ft wide.
Who owns FM 616 over Lavaca River East Relief?
It is owned by the State Highway Agency.