Salt Creek R Pct 3 over Cottonwood Creek
FairJack County, Texas · 1.67 Mi. S. from US 380 · Structure no. 021200AA0243001
- Built
- 1949
- 76 years old
- Condition
- Fair
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 25 ft
- 1 main span
- Daily traffic
- 100
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
Salt Creek R Pct 3 over Cottonwood Creek is a steel stringer/multi-beam or girder carrying Salt Creek R Pct 3 over Cottonwood Creek in Jack County, Texas. It was built in 1949, so it is 76 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 100 vehicles a day, projected to reach 110 by 2031. The structure is 25 ft (7.6 m) long and 16 ft wide. If it were closed, the detour would be 18 mi (29 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Salt Creek R Pct 3 over Cottonwood Creek built?
It was built in 1949, making it 76 years old in 2025.
What condition is Salt Creek R Pct 3 over Cottonwood Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.
How much traffic does Salt Creek R Pct 3 over Cottonwood Creek carry?
About 100 vehicles per day (2019 count).
How long is Salt Creek R Pct 3 over Cottonwood Creek?
The structure is 25 ft (7.6 m) long with a longest span of 23 ft (7 m) and a deck 16 ft wide.
Who owns Salt Creek R Pct 3 over Cottonwood Creek?
It is owned by the County Highway Agency.