US Bridges

Post Oak RD Pct 1 over Trib of Big Cleveland Ck

Fair

Jack County, Texas · 6.25 Mi. N. from US 281 · Structure no. 021200AA0134003

Built
1935
90 years old
Condition
Fair
inspected February 2023
Type
Slab
Concrete
Length
28 ft
2 main spans
Daily traffic
100
2019 count
Owner
County
County Highway Agency

About this bridge

Post Oak RD Pct 1 over Trib of Big Cleveland Ck is a concrete slab carrying Post Oak RD Pct 1 over Trib of Big Cleveland Ck in Jack County, Texas. It was built in 1935, so it is 90 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 100 vehicles a day, projected to reach 100 by 2029. The structure is 28 ft (8.5 m) long and 28 ft wide. If it were closed, the detour would be 16.2 mi (26 km).

CarriesPost Oak RD Pct 1
CrossesTrib of Big Cleveland Ck
Location6.25 Mi. N. from US 281
RouteCounty Highway 134
StateTexas
Coordinates33.31126, -98.15714
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length28 ft (8.5 m)
Longest span14 ft (4.3 m)
Deck width28 ft (8.4 m)
Roadway width26 ft (7.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2019)
Projected traffic100 by 2029
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed16.2 mi (26 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Post Oak RD Pct 1 over Trib of Big Cleveland Ck built?

It was built in 1935, making it 90 years old in 2025.

What condition is Post Oak RD Pct 1 over Trib of Big Cleveland Ck in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.

How much traffic does Post Oak RD Pct 1 over Trib of Big Cleveland Ck carry?

About 100 vehicles per day (2019 count).

How long is Post Oak RD Pct 1 over Trib of Big Cleveland Ck?

The structure is 28 ft (8.5 m) long with a longest span of 14 ft (4.3 m) and a deck 28 ft wide.

Who owns Post Oak RD Pct 1 over Trib of Big Cleveland Ck?

It is owned by the County Highway Agency.