Cocacola Rch Pct 1 over West Fork Trinity River
GoodJack County, Texas · 4.6 MI S of FM 1810 · Structure no. 021200AA0130001
- Built
- 2002
- 23 years old
- Condition
- Good
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 220 ft
- 4 main spans
- Daily traffic
- 100
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
Cocacola Rch Pct 1 over West Fork Trinity River is a prestressed concrete stringer/multi-beam or girder carrying Cocacola Rch Pct 1 over West Fork Trinity River in Jack County, Texas. It was built in 2002, so it is 23 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 100 vehicles a day, projected to reach 210 by 2029. The structure is 220 ft (67.1 m) long and 26 ft wide. If it were closed, the detour would be 28 mi (45 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Cocacola Rch Pct 1 over West Fork Trinity River built?
It was built in 2002, making it 23 years old in 2025.
What condition is Cocacola Rch Pct 1 over West Fork Trinity River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does Cocacola Rch Pct 1 over West Fork Trinity River carry?
About 100 vehicles per day (2019 count).
How long is Cocacola Rch Pct 1 over West Fork Trinity River?
The structure is 220 ft (67.1 m) long with a longest span of 60 ft (18.3 m) and a deck 26 ft wide.
Who owns Cocacola Rch Pct 1 over West Fork Trinity River?
It is owned by the County Highway Agency.