US Bridges

Cocacola Rch Pct 1 over West Fork Trinity River

Good

Jack County, Texas · 4.6 MI S of FM 1810 · Structure no. 021200AA0130001

Built
2002
23 years old
Condition
Good
inspected February 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
220 ft
4 main spans
Daily traffic
100
2019 count
Owner
County
County Highway Agency

About this bridge

Cocacola Rch Pct 1 over West Fork Trinity River is a prestressed concrete stringer/multi-beam or girder carrying Cocacola Rch Pct 1 over West Fork Trinity River in Jack County, Texas. It was built in 2002, so it is 23 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, projected to reach 210 by 2029. The structure is 220 ft (67.1 m) long and 26 ft wide. If it were closed, the detour would be 28 mi (45 km).

CarriesCocacola Rch Pct 1
CrossesWest Fork Trinity River
Location4.6 MI S of FM 1810
RouteCounty Highway 0
StateTexas
Coordinates33.26811, -98.03091
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length220 ft (67.1 m)
Longest span60 ft (18.3 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2019)
Projected traffic210 by 2029
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed28 mi (45 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Cocacola Rch Pct 1 over West Fork Trinity River built?

It was built in 2002, making it 23 years old in 2025.

What condition is Cocacola Rch Pct 1 over West Fork Trinity River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does Cocacola Rch Pct 1 over West Fork Trinity River carry?

About 100 vehicles per day (2019 count).

How long is Cocacola Rch Pct 1 over West Fork Trinity River?

The structure is 220 ft (67.1 m) long with a longest span of 60 ft (18.3 m) and a deck 26 ft wide.

Who owns Cocacola Rch Pct 1 over West Fork Trinity River?

It is owned by the County Highway Agency.