Willow Pt RD Pct 2 over Jasper Creek
FairPosted for loadJack County, Texas · 2.25 MI S of FM 1156 · Structure no. 021200AA0113001
- Built
- 1982
- 43 years old
- Condition
- Fair
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 94 ft
- 1 main span
- Daily traffic
- 100
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
Willow Pt RD Pct 2 over Jasper Creek is a steel stringer/multi-beam or girder carrying Willow Pt RD Pct 2 over Jasper Creek in Jack County, Texas. It was built in 1982, so it is 43 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 100 vehicles a day, projected to reach 100 by 2029. The structure is 94 ft (28.7 m) long and 16 ft wide. If it were closed, the detour would be 16.8 mi (27 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Willow Pt RD Pct 2 over Jasper Creek built?
It was built in 1982, making it 43 years old in 2025.
What condition is Willow Pt RD Pct 2 over Jasper Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.
How much traffic does Willow Pt RD Pct 2 over Jasper Creek carry?
About 100 vehicles per day (2019 count).
How long is Willow Pt RD Pct 2 over Jasper Creek?
The structure is 94 ft (28.7 m) long with a longest span of 46 ft (14 m) and a deck 16 ft wide.
Who owns Willow Pt RD Pct 2 over Jasper Creek?
It is owned by the County Highway Agency.