US Bridges

FM 816 over Spring Creek Relief

Good

Hunt County, Texas · 3.1 MI E of FM 272 · Structure no. 011170109701019

Built
2002
23 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
60 ft
1 main span
Daily traffic
492
2020 count
Owner
State
State Highway Agency

About this bridge

FM 816 over Spring Creek Relief is a prestressed concrete stringer/multi-beam or girder carrying FM 816 over Spring Creek Relief in Hunt County, Texas. It was built in 2002, so it is 23 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 492 vehicles a day, roughly 14% of them trucks, projected to reach 710 by 2030. The structure is 60 ft (18.3 m) long and 32 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesFM 816
CrossesSpring Creek Relief
Location3.1 MI E of FM 272
RouteState Highway 816
StateTexas
Coordinates33.36184, -96.10966
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length60 ft (18.3 m)
Longest span60 ft (18.3 m)
Deck width32 ft (9.9 m)
Roadway width29 ft (8.9 m)
Vertical clearance over deck0 ft (0 m)

Traffic and service

Average daily traffic492 (2020)
Projected traffic710 by 2030
Trucks14%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 816 over Spring Creek Relief built?

It was built in 2002, making it 23 years old in 2025.

What condition is FM 816 over Spring Creek Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does FM 816 over Spring Creek Relief carry?

About 492 vehicles per day (2020 count), of which roughly 14% are trucks.

How long is FM 816 over Spring Creek Relief?

The structure is 60 ft (18.3 m) long with a longest span of 60 ft (18.3 m) and a deck 32 ft wide.

Who owns FM 816 over Spring Creek Relief?

It is owned by the State Highway Agency.