SH 24 & 50 Nbml over So.Sulphur Ri Relief
GoodHunt County, Texas · 2.7MI Sjct SH50/24&SH224 · Structure no. 011170076801015
- Built
- 1984
- 41 years old
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 640 ft
- 8 main spans
- Daily traffic
- 5,197
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
SH 24 & 50 Nbml over So.Sulphur Ri Relief is a prestressed concrete stringer/multi-beam or girder carrying SH 24 & 50 Nbml over So.Sulphur Ri Relief in Hunt County, Texas. It was built in 1984, so it is 41 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,197 vehicles a day, roughly 12% of them trucks, projected to reach 6,720 by 2033. The structure is 640 ft (195.1 m) long and 40 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 24 & 50 Nbml over So.Sulphur Ri Relief built?
It was built in 1984, making it 41 years old in 2025.
What condition is SH 24 & 50 Nbml over So.Sulphur Ri Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does SH 24 & 50 Nbml over So.Sulphur Ri Relief carry?
About 5,197 vehicles per day (2020 count), of which roughly 12% are trucks.
How long is SH 24 & 50 Nbml over So.Sulphur Ri Relief?
The structure is 640 ft (195.1 m) long with a longest span of 80 ft (24.4 m) and a deck 40 ft wide.
Who owns SH 24 & 50 Nbml over So.Sulphur Ri Relief?
It is owned by the State Highway Agency.