US Bridges

IH 30 Wbml over Monty Stratton Pkwy

Fair

Hunt County, Texas · 1.0 MI West of SH 34 · Structure no. 011170000913462

Built
2011
14 years old
Condition
Fair
inspected January 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
263 ft
1 main span
Daily traffic
20,257
2019 count
Owner
State
State Highway Agency

About this bridge

IH 30 Wbml over Monty Stratton Pkwy is a prestressed concrete stringer/multi-beam or girder carrying IH 30 Wbml over Monty Stratton Pkwy in Hunt County, Texas. It was built in 2011, so it is 14 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 20,257 vehicles a day, roughly 17% of them trucks, projected to reach 31,900 by 2033. The structure is 263 ft (80.2 m) long and 48 ft wide.

CarriesIH 30 Wbml
CrossesMonty Stratton Pkwy
Location1.0 MI West of SH 34
RouteInterstate 30
StateTexas
Coordinates33.08859, -96.12537
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1 (+2 approach)
Design loadHS 20
Structure length263 ft (80.2 m)
Longest span120 ft (36.6 m)
Deck width48 ft (14.6 m)
Roadway width46 ft (14 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20,257 (2019)
Projected traffic31,900 by 2033
Trucks17%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH 30 Wbml over Monty Stratton Pkwy built?

It was built in 2011, making it 14 years old in 2025.

What condition is IH 30 Wbml over Monty Stratton Pkwy in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.

How much traffic does IH 30 Wbml over Monty Stratton Pkwy carry?

About 20,257 vehicles per day (2019 count), of which roughly 17% are trucks.

How long is IH 30 Wbml over Monty Stratton Pkwy?

The structure is 263 ft (80.2 m) long with a longest span of 120 ft (36.6 m) and a deck 48 ft wide.

Who owns IH 30 Wbml over Monty Stratton Pkwy?

It is owned by the State Highway Agency.