IH30- S Frtg RD over West Caddo Creek
FairHunt County, Texas · 0.5 MI W JCT FM36 IH30 · Structure no. 011170000913378
- Built
- 1986
- 39 years old
- Condition
- Fair
- inspected January 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 300 ft
- 6 main spans
- Daily traffic
- 1,460
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
IH30- S Frtg RD over West Caddo Creek is a prestressed concrete box beam or girders - multiple carrying IH30- S Frtg RD over West Caddo Creek in Hunt County, Texas. It was built in 1986, so it is 39 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,460 vehicles a day, roughly 14% of them trucks, projected to reach 2,050 by 2033. The structure is 300 ft (91.4 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH30- S Frtg RD over West Caddo Creek built?
It was built in 1986, making it 39 years old in 2025.
What condition is IH30- S Frtg RD over West Caddo Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.
How much traffic does IH30- S Frtg RD over West Caddo Creek carry?
About 1,460 vehicles per day (2013 count), of which roughly 14% are trucks.
How long is IH30- S Frtg RD over West Caddo Creek?
The structure is 300 ft (91.4 m) long with a longest span of 50 ft (15.2 m) and a deck 36 ft wide.
Who owns IH30- S Frtg RD over West Caddo Creek?
It is owned by the State Highway Agency.