IH 10 WB over Arroyo Balluco
GoodHudspeth County, Texas · 0.40 MI W of FM 34 · Structure no. 241160000205104
- Built
- 1963
- 62 years old, rebuilt 1970
- Condition
- Good
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 371 ft
- 7 main spans
- Daily traffic
- 12,380
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
IH 10 WB over Arroyo Balluco is a prestressed concrete stringer/multi-beam or girder carrying IH 10 WB over Arroyo Balluco in Hudspeth County, Texas. It was built in 1963 and reconstructed in 1970, so it is 62 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 12,380 vehicles a day, roughly 37% of them trucks, projected to reach 12,730 by 2033. The structure is 371 ft (113.1 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 10 WB over Arroyo Balluco built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1970.
What condition is IH 10 WB over Arroyo Balluco in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does IH 10 WB over Arroyo Balluco carry?
About 12,380 vehicles per day (2019 count), of which roughly 37% are trucks.
How long is IH 10 WB over Arroyo Balluco?
The structure is 371 ft (113.1 m) long with a longest span of 57 ft (17.4 m) and a deck 44 ft wide.
Who owns IH 10 WB over Arroyo Balluco?
It is owned by the State Highway Agency.