US Bridges

IH 30 EB over US 67

Fair

Hopkins County, Texas · 4.0 MI E of FM 69 · Structure no. 011130061001184

Built
1962
63 years old
Condition
Fair
inspected January 2025
Type
Stringer/Multi-beam or Girder
Concrete
Length
103 ft
3 main spans
Daily traffic
17,432
2019 count
Owner
State
State Highway Agency

About this bridge

IH 30 EB over US 67 is a concrete stringer/multi-beam or girder carrying IH 30 EB over US 67 in Hopkins County, Texas. It was built in 1962, so it is 63 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 17,432 vehicles a day, roughly 35% of them trucks, projected to reach 25,996 by 2039. The structure is 103 ft (31.3 m) long and 39 ft wide.

CarriesIH 30 EB
CrossesUS 67
Location4.0 MI E of FM 69
RouteInterstate 30
StateTexas
Coordinates33.15512, -95.42627
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.9 US tons
Inventory rating37 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length103 ft (31.3 m)
Longest span40 ft (12.2 m)
Deck width39 ft (11.9 m)
Roadway width36 ft (11.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,432 (2019)
Projected traffic25,996 by 2039
Trucks35%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH 30 EB over US 67 built?

It was built in 1962, making it 63 years old in 2025.

What condition is IH 30 EB over US 67 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.

How much traffic does IH 30 EB over US 67 carry?

About 17,432 vehicles per day (2019 count), of which roughly 35% are trucks.

How long is IH 30 EB over US 67?

The structure is 103 ft (31.3 m) long with a longest span of 40 ft (12.2 m) and a deck 39 ft wide.

Who owns IH 30 EB over US 67?

It is owned by the State Highway Agency.