US Bridges

FM 339 over Tehuacana Creek

Good

Hill County, Texas · 0.6 MI SE of FM 308 · Structure no. 091100166201006

Built
2017
8 years old
Condition
Good
inspected February 2023
Type
Other
Prestressed Concrete
Length
120 ft
3 main spans
Daily traffic
100
2020 count
Owner
State
State Highway Agency

About this bridge

FM 339 over Tehuacana Creek is a prestressed concrete other carrying FM 339 over Tehuacana Creek in Hill County, Texas. It was built in 2017, so it is 8 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 18% of them trucks, projected to reach 424 by 2039. The structure is 120 ft (36.6 m) long and 32 ft wide. If it were closed, the detour would be 11.8 mi (19 km).

CarriesFM 339
CrossesTehuacana Creek
Location0.6 MI SE of FM 308
RouteState Highway 339
StateTexas
Coordinates31.81374, -96.95418
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeOther
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length120 ft (36.6 m)
Longest span40 ft (12.2 m)
Deck width32 ft (9.8 m)
Roadway width29 ft (8.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2020)
Projected traffic424 by 2039
Trucks18%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed11.8 mi (19 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was FM 339 over Tehuacana Creek built?

It was built in 2017, making it 8 years old in 2025.

What condition is FM 339 over Tehuacana Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does FM 339 over Tehuacana Creek carry?

About 100 vehicles per day (2020 count), of which roughly 18% are trucks.

How long is FM 339 over Tehuacana Creek?

The structure is 120 ft (36.6 m) long with a longest span of 40 ft (12.2 m) and a deck 32 ft wide.

Who owns FM 339 over Tehuacana Creek?

It is owned by the State Highway Agency.