US Bridges

FM 67 over Trib Aquilla Creek

Good

Hill County, Texas · 8.3 MI W of US 81 · Structure no. 091100065601011

Built
1987
38 years old, rebuilt 2024
Condition
Good
inspected November 2024
Type
Culvert
Concrete
Length
26 ft
3 main spans
Daily traffic
2,010
2020 count
Owner
State
State Highway Agency

About this bridge

FM 67 over Trib Aquilla Creek is a concrete culvert carrying FM 67 over Trib Aquilla Creek in Hill County, Texas. It was built in 1987 and reconstructed in 2024, so it is 38 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,010 vehicles a day, roughly 1% of them trucks, projected to reach 3,382 by 2039. The structure is 26 ft (7.9 m) long and 46 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesFM 67
CrossesTrib Aquilla Creek
Location8.3 MI W of US 81
RouteState Highway 67
StateTexas
Coordinates32.15594, -97.29825
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length26 ft (7.9 m)
Longest span8 ft (2.4 m)
Deck width46 ft (14 m)
Roadway width30 ft (9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,010 (2020)
Projected traffic3,382 by 2039
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$400,000
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 67 over Trib Aquilla Creek built?

It was built in 1987, making it 38 years old in 2025. It was reconstructed in 2024.

What condition is FM 67 over Trib Aquilla Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does FM 67 over Trib Aquilla Creek carry?

About 2,010 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is FM 67 over Trib Aquilla Creek?

The structure is 26 ft (7.9 m) long with a longest span of 8 ft (2.4 m) and a deck 46 ft wide.

Who owns FM 67 over Trib Aquilla Creek?

It is owned by the State Highway Agency.