River Bend Drive over Mission Pilot Channel
FairHidalgo County, Texas · 0.25 MI S of Circle DR · Structure no. 211090M00667001
- Built
- 1990
- 35 years old
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 80 ft
- 2 main spans
- Daily traffic
- 400
- 2009 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
River Bend Drive over Mission Pilot Channel is a concrete stringer/multi-beam or girder carrying River Bend Drive over Mission Pilot Channel in Hidalgo County, Texas. It was built in 1990, so it is 35 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 400 vehicles a day, roughly 3% of them trucks, projected to reach 400 by 2042. The structure is 80 ft (24.4 m) long and 40 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was River Bend Drive over Mission Pilot Channel built?
It was built in 1990, making it 35 years old in 2025.
What condition is River Bend Drive over Mission Pilot Channel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does River Bend Drive over Mission Pilot Channel carry?
About 400 vehicles per day (2009 count), of which roughly 3% are trucks.
How long is River Bend Drive over Mission Pilot Channel?
The structure is 80 ft (24.4 m) long with a longest span of 40 ft (12.2 m) and a deck 40 ft wide.
Who owns River Bend Drive over Mission Pilot Channel?
It is owned by the City or Municipal Highway Agency.