Freddy Gonzalez DR over N Main Drainage Ditch
FairHidalgo County, Texas · 0.25 MI E of FM 2061 · Structure no. 211090E00320001
- Built
- 1975
- 50 years old, rebuilt 1986
- Condition
- Fair
- inspected May 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 52 ft
- 1 main span
- Daily traffic
- 19,811
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Freddy Gonzalez DR over N Main Drainage Ditch is a prestressed concrete box beam or girders - multiple carrying Freddy Gonzalez DR over N Main Drainage Ditch in Hidalgo County, Texas. It was built in 1975 and reconstructed in 1986, so it is 50 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 19,811 vehicles a day, roughly 4% of them trucks, projected to reach 29,717 by 2042. The structure is 52 ft (15.9 m) long and 73 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Freddy Gonzalez DR over N Main Drainage Ditch built?
It was built in 1975, making it 50 years old in 2025. It was reconstructed in 1986.
What condition is Freddy Gonzalez DR over N Main Drainage Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Freddy Gonzalez DR over N Main Drainage Ditch carry?
About 19,811 vehicles per day (2019 count), of which roughly 4% are trucks.
How long is Freddy Gonzalez DR over N Main Drainage Ditch?
The structure is 52 ft (15.9 m) long with a longest span of 50 ft (15.2 m) and a deck 73 ft wide.
Who owns Freddy Gonzalez DR over N Main Drainage Ditch?
It is owned by the City or Municipal Highway Agency.