US Bridges

N Fldwy Levee RD over Drainage Ditch

Good

Hidalgo County, Texas · 0.1 MI E of Unc Peters RD · Structure no. 211090AA5220001

Built
2012
13 years old
Condition
Good
inspected May 2024
Type
Culvert
Concrete
Length
25 ft
2 main spans
Daily traffic
20
2012 count
Owner
County
County Highway Agency

About this bridge

N Fldwy Levee RD over Drainage Ditch is a concrete culvert carrying N Fldwy Levee RD over Drainage Ditch in Hidalgo County, Texas. It was built in 2012, so it is 13 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 20 vehicles a day, roughly 1% of them trucks, projected to reach 50 by 2032. The structure is 25 ft (7.6 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesN Fldwy Levee RD
CrossesDrainage Ditch
Location0.1 MI E of Unc Peters RD
RouteCounty Highway 0
StateTexas
Coordinates26.30547, -97.91508
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadUnknown
Structure length25 ft (7.6 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20 (2012)
Projected traffic50 by 2032
Trucks1%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was N Fldwy Levee RD over Drainage Ditch built?

It was built in 2012, making it 13 years old in 2025.

What condition is N Fldwy Levee RD over Drainage Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does N Fldwy Levee RD over Drainage Ditch carry?

About 20 vehicles per day (2012 count), of which roughly 1% are trucks.

How long is N Fldwy Levee RD over Drainage Ditch?

The structure is 25 ft (7.6 m) long with a longest span of 10 ft (3 m).

Who owns N Fldwy Levee RD over Drainage Ditch?

It is owned by the County Highway Agency.