Mile 2 West Road over Main Supply Canal
GoodHidalgo County, Texas · 1.04 MI N of Mile 9 N RD · Structure no. 211090AA0825002
- Built
- 2004
- 21 years old
- Condition
- Good
- inspected May 2024
- Type
- Culvert
- Concrete
- Length
- 35 ft
- 4 main spans
- Daily traffic
- 3,599
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Mile 2 West Road over Main Supply Canal is a concrete culvert carrying Mile 2 West Road over Main Supply Canal in Hidalgo County, Texas. It was built in 2004, so it is 21 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,599 vehicles a day, roughly 2% of them trucks, projected to reach 1,640 by 2032. The structure is 35 ft (10.7 m) long. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mile 2 West Road over Main Supply Canal built?
It was built in 2004, making it 21 years old in 2025.
What condition is Mile 2 West Road over Main Supply Canal in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does Mile 2 West Road over Main Supply Canal carry?
About 3,599 vehicles per day (2024 count), of which roughly 2% are trucks.
How long is Mile 2 West Road over Main Supply Canal?
The structure is 35 ft (10.7 m) long with a longest span of 8 ft (2.4 m).
Who owns Mile 2 West Road over Main Supply Canal?
It is owned by the County Highway Agency.