Anaya Road over S Floodwater Channel
FairPosted for loadHidalgo County, Texas · 0.10 MI W of FM 907 · Structure no. 211090AA0652001
- Built
- 1975
- 50 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 63 ft
- 2 main spans
- Daily traffic
- 400
- 2009 count
- Owner
- County
- County Highway Agency
About this bridge
Anaya Road over S Floodwater Channel is a concrete stringer/multi-beam or girder carrying Anaya Road over S Floodwater Channel in Hidalgo County, Texas. It was built in 1975, so it is 50 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 400 vehicles a day, roughly 3% of them trucks, projected to reach 400 by 2042. The structure is 63 ft (19.2 m) long and 25 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Anaya Road over S Floodwater Channel built?
It was built in 1975, making it 50 years old in 2025.
What condition is Anaya Road over S Floodwater Channel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Anaya Road over S Floodwater Channel carry?
About 400 vehicles per day (2009 count), of which roughly 3% are trucks.
How long is Anaya Road over S Floodwater Channel?
The structure is 63 ft (19.2 m) long with a longest span of 30 ft (9.1 m) and a deck 25 ft wide.
Who owns Anaya Road over S Floodwater Channel?
It is owned by the County Highway Agency.