SP 115 SB over Hackney Lake Floodway
FairHidalgo County, Texas · 0.50 MI S of FM 1016 · Structure no. 211090180401007
- Built
- 1981
- 44 years old, rebuilt 2009
- Condition
- Fair
- inspected April 2023
- Type
- Slab
- Concrete Continuous
- Length
- 2,110 ft
- 84 main spans
- Daily traffic
- 16,275
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SP 115 SB over Hackney Lake Floodway is a concrete continuous slab carrying SP 115 SB over Hackney Lake Floodway in Hidalgo County, Texas. It was built in 1981 and reconstructed in 2009, so it is 44 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 16,275 vehicles a day, roughly 1% of them trucks, projected to reach 13,240 by 2033. The structure is 2,110 ft (643.1 m) long and 58 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SP 115 SB over Hackney Lake Floodway built?
It was built in 1981, making it 44 years old in 2025. It was reconstructed in 2009.
What condition is SP 115 SB over Hackney Lake Floodway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does SP 115 SB over Hackney Lake Floodway carry?
About 16,275 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is SP 115 SB over Hackney Lake Floodway?
The structure is 2,110 ft (643.1 m) long with a longest span of 30 ft (9.1 m) and a deck 58 ft wide.
Who owns SP 115 SB over Hackney Lake Floodway?
It is owned by the State Highway Agency.