US Bridges

FM 494 over Mission Floodway Channel

Good

Hidalgo County, Texas · 0.70 MI South of US 83 · Structure no. 211090086401003

Built
2005
20 years old
Condition
Good
inspected April 2023
Type
Culvert
Aluminum, Wrought Iron, or Cast Iron
Length
42 ft
3 main spans
Daily traffic
27,184
2024 count
Owner
State
State Highway Agency

About this bridge

FM 494 over Mission Floodway Channel is a aluminum, wrought iron, or cast iron culvert carrying FM 494 over Mission Floodway Channel in Hidalgo County, Texas. It was built in 2005, so it is 20 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 27,184 vehicles a day, roughly 2% of them trucks, projected to reach 40,640 by 2033. The structure is 42 ft (12.8 m) long. If it were closed, the detour would be 8.1 mi (13 km).

CarriesFM 494
CrossesMission Floodway Channel
Location0.70 MI South of US 83
RouteState Highway 494
StateTexas
Coordinates26.18613, -98.29002
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialAluminum, Wrought Iron, or Cast Iron
DeckNot applicable
Main spans3
Design loadHS 25 or greater
Structure length42 ft (12.8 m)
Longest span11 ft (3.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic27,184 (2024)
Projected traffic40,640 by 2033
Trucks2%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 494 over Mission Floodway Channel built?

It was built in 2005, making it 20 years old in 2025.

What condition is FM 494 over Mission Floodway Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does FM 494 over Mission Floodway Channel carry?

About 27,184 vehicles per day (2024 count), of which roughly 2% are trucks.

How long is FM 494 over Mission Floodway Channel?

The structure is 42 ft (12.8 m) long with a longest span of 11 ft (3.4 m).

Who owns FM 494 over Mission Floodway Channel?

It is owned by the State Highway Agency.