US Bridges

IH69CSB to IH2WB over IH 69C Sbfr ; SH 495 Etc

Good

Hidalgo County, Texas · @ IH69C/IH2 Interchange · Structure no. 211090025508323

Built
2022
3 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
3,248 ft
22 main spans
Daily traffic
24,000
2020 count
Owner
State
State Highway Agency

About this bridge

IH69CSB to IH2WB over IH 69C Sbfr ; SH 495 Etc is a prestressed concrete stringer/multi-beam or girder carrying IH69CSB to IH2WB over IH 69C Sbfr ; SH 495 Etc in Hidalgo County, Texas. It was built in 2022, so it is 3 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 24,000 vehicles a day, roughly 10% of them trucks, projected to reach 32,400 by 2045. The structure is 3,248 ft (990 m) long and 40 ft wide.

CarriesIH69CSB to IH2WB
CrossesIH 69C Sbfr ; SH 495 Etc
Location@ IH69C/IH2 Interchange
RouteInterstate 69
StateTexas
Coordinates26.20861, -98.18248
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans22 (+1 approach)
Design loadHL 93
Structure length3,248 ft (990 m)
Longest span156 ft (47.5 m)
Deck width40 ft (12.2 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic24,000 (2020)
Projected traffic32,400 by 2045
Trucks10%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH69CSB to IH2WB over IH 69C Sbfr ; SH 495 Etc built?

It was built in 2022, making it 3 years old in 2025.

What condition is IH69CSB to IH2WB over IH 69C Sbfr ; SH 495 Etc in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does IH69CSB to IH2WB over IH 69C Sbfr ; SH 495 Etc carry?

About 24,000 vehicles per day (2020 count), of which roughly 10% are trucks.

How long is IH69CSB to IH2WB over IH 69C Sbfr ; SH 495 Etc?

The structure is 3,248 ft (990 m) long with a longest span of 156 ft (47.5 m) and a deck 40 ft wide.

Who owns IH69CSB to IH2WB over IH 69C Sbfr ; SH 495 Etc?

It is owned by the State Highway Agency.