US Bridges

Campo Del Sol Pkwy over Brushy Creek Trib

Good

Hays County, Texas · 1.6 MI E of IH 35 · Structure no. 141060AA9931001

Built
2022
3 years old
Condition
Good
inspected October 2024
Type
Culvert
Concrete
Length
28 ft
3 main spans
Daily traffic
248
2020 count
Owner
County
County Highway Agency

About this bridge

Campo Del Sol Pkwy over Brushy Creek Trib is a concrete culvert carrying Campo Del Sol Pkwy over Brushy Creek Trib in Hays County, Texas. It was built in 2022, so it is 3 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 248 vehicles a day, roughly 3% of them trucks, projected to reach 248 by 2042. The structure is 28 ft (8.5 m) long.

CarriesCampo Del Sol Pkwy
CrossesBrushy Creek Trib
Location1.6 MI E of IH 35
RouteCity Street 0
StateTexas
Coordinates30.0811, -97.80157
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadUnknown
Structure length28 ft (8.5 m)
Longest span8 ft (2.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic248 (2020)
Projected traffic248 by 2042
Trucks3%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Campo Del Sol Pkwy over Brushy Creek Trib built?

It was built in 2022, making it 3 years old in 2025.

What condition is Campo Del Sol Pkwy over Brushy Creek Trib in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Campo Del Sol Pkwy over Brushy Creek Trib carry?

About 248 vehicles per day (2020 count), of which roughly 3% are trucks.

How long is Campo Del Sol Pkwy over Brushy Creek Trib?

The structure is 28 ft (8.5 m) long with a longest span of 8 ft (2.4 m).

Who owns Campo Del Sol Pkwy over Brushy Creek Trib?

It is owned by the County Highway Agency.