US Bridges

FM 110 over Cottonwood Crk Trib 2

Good

Hays County, Texas · 0.7 M. E of Int SH 123 · Structure no. 141060354502209

Built
2021
4 years old
Condition
Good
inspected November 2024
Type
Culvert
Concrete
Length
54 ft
5 main spans
Daily traffic
2,761
2023 count
Owner
State
State Highway Agency

About this bridge

FM 110 over Cottonwood Crk Trib 2 is a concrete culvert carrying FM 110 over Cottonwood Crk Trib 2 in Hays County, Texas. It was built in 2021, so it is 4 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,761 vehicles a day, roughly 17% of them trucks, projected to reach 1 by 1900. The structure is 54 ft (16.5 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesFM 110
CrossesCottonwood Crk Trib 2
Location0.7 M. E of Int SH 123
RouteState Highway 110
StateTexas
Coordinates29.82961, -97.9308
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans5
Design loadHL 93
Structure length54 ft (16.5 m)
Longest span8 ft (2.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,761 (2023)
Projected traffic1 by 1900
Trucks17%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 110 over Cottonwood Crk Trib 2 built?

It was built in 2021, making it 4 years old in 2025.

What condition is FM 110 over Cottonwood Crk Trib 2 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does FM 110 over Cottonwood Crk Trib 2 carry?

About 2,761 vehicles per day (2023 count), of which roughly 17% are trucks.

How long is FM 110 over Cottonwood Crk Trib 2?

The structure is 54 ft (16.5 m) long with a longest span of 8 ft (2.4 m).

Who owns FM 110 over Cottonwood Crk Trib 2?

It is owned by the State Highway Agency.