US Bridges

US 277 NB over Paint Creek Relief

Fair

Haskell County, Texas · 10.40 MI S of US 380 · Structure no. 081050015704024

Built
1931
94 years old, rebuilt 1955
Condition
Fair
inspected June 2023
Type
Tee Beam
Concrete
Length
53 ft
2 main spans
Daily traffic
2,526
2020 count
Owner
State
State Highway Agency

About this bridge

US 277 NB over Paint Creek Relief is a concrete tee beam carrying US 277 NB over Paint Creek Relief in Haskell County, Texas. It was built in 1931 and reconstructed in 1955, so it is 94 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,526 vehicles a day, roughly 19% of them trucks, projected to reach 2,530 by 2033. The structure is 53 ft (16.2 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 277 NB
CrossesPaint Creek Relief
Location10.40 MI S of US 380
RouteU.S. Route 277
StateTexas
Coordinates33.01342, -99.78464
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59 US tons
Inventory rating34.9 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length53 ft (16.2 m)
Longest span27 ft (8.2 m)
Deck width42 ft (12.8 m)
Roadway width39 ft (11.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,526 (2020)
Projected traffic2,530 by 2033
Trucks19%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 277 NB over Paint Creek Relief built?

It was built in 1931, making it 94 years old in 2025. It was reconstructed in 1955.

What condition is US 277 NB over Paint Creek Relief in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does US 277 NB over Paint Creek Relief carry?

About 2,526 vehicles per day (2020 count), of which roughly 19% are trucks.

How long is US 277 NB over Paint Creek Relief?

The structure is 53 ft (16.2 m) long with a longest span of 27 ft (8.2 m) and a deck 42 ft wide.

Who owns US 277 NB over Paint Creek Relief?

It is owned by the State Highway Agency.