Plant RD (cr 2607) over Harrison Bayou Branch
GoodHarrison County, Texas · 2.5 MI W of FM 9 · Structure no. 191030AA0315004
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected July 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 60 ft
- 1 main span
- Daily traffic
- 39
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Plant RD (cr 2607) over Harrison Bayou Branch is a prestressed concrete box beam or girders - multiple carrying Plant RD (cr 2607) over Harrison Bayou Branch in Harrison County, Texas. It was built in 2014, so it is 11 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 39 vehicles a day, roughly 3% of them trucks, projected to reach 185 by 2042. The structure is 60 ft (18.3 m) long and 26 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Plant RD (cr 2607) over Harrison Bayou Branch built?
It was built in 2014, making it 11 years old in 2025.
What condition is Plant RD (cr 2607) over Harrison Bayou Branch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does Plant RD (cr 2607) over Harrison Bayou Branch carry?
About 39 vehicles per day (2023 count), of which roughly 3% are trucks.
How long is Plant RD (cr 2607) over Harrison Bayou Branch?
The structure is 60 ft (18.3 m) long with a longest span of 60 ft (18.3 m) and a deck 26 ft wide.
Who owns Plant RD (cr 2607) over Harrison Bayou Branch?
It is owned by the County Highway Agency.