US Bridges

Everpines Trail over Hcfcd M121-00-00

Good

Harris County, Texas · 0.4 MI W of S Cherry ST · Structure no. 121020W38377109

Built
2022
3 years old
Condition
Good
inspected December 2023
Type
Culvert
Concrete
Length
69 ft
5 main spans
Daily traffic
200
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Everpines Trail over Hcfcd M121-00-00 is a concrete culvert carrying Everpines Trail over Hcfcd M121-00-00 in Harris County, Texas. It was built in 2022, so it is 3 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 200 vehicles a day, roughly 1% of them trucks, projected to reach 400 by 2041. The structure is 69 ft (21 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesEverpines Trail
CrossesHcfcd M121-00-00
Location0.4 MI W of S Cherry ST
RouteCity Street 0
StateTexas
Coordinates30.07188, -95.6163
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans5
Design loadHS 20
Structure length69 ft (21 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2022)
Projected traffic400 by 2041
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Everpines Trail over Hcfcd M121-00-00 built?

It was built in 2022, making it 3 years old in 2025.

What condition is Everpines Trail over Hcfcd M121-00-00 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Everpines Trail over Hcfcd M121-00-00 carry?

About 200 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is Everpines Trail over Hcfcd M121-00-00?

The structure is 69 ft (21 m) long with a longest span of 10 ft (3 m).

Who owns Everpines Trail over Hcfcd M121-00-00?

It is owned by the City or Municipal Highway Agency.