Hardy Toll RD SB over UPRR & Hcfcd Ditch
FairHarris County, Texas · 1.1 MI S of FM 525 · Structure no. 121020TOL040219
- Built
- 1987
- 38 years old
- Condition
- Fair
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,510 ft
- 10 main spans
- Daily traffic
- 30,000
- 2015 count
- Owner
- Toll Authority
- Local Toll Authority
About this bridge
Hardy Toll RD SB over UPRR & Hcfcd Ditch is a prestressed concrete stringer/multi-beam or girder carrying Hardy Toll RD SB over UPRR & Hcfcd Ditch in Harris County, Texas. It was built in 1987, so it is 38 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 30,000 vehicles a day, roughly 5% of them trucks, projected to reach 50,000 by 2035. The structure is 1,510 ft (460.2 m) long and 49 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Hardy Toll RD SB over UPRR & Hcfcd Ditch built?
It was built in 1987, making it 38 years old in 2025.
What condition is Hardy Toll RD SB over UPRR & Hcfcd Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does Hardy Toll RD SB over UPRR & Hcfcd Ditch carry?
About 30,000 vehicles per day (2015 count), of which roughly 5% are trucks.
How long is Hardy Toll RD SB over UPRR & Hcfcd Ditch?
The structure is 1,510 ft (460.2 m) long with a longest span of 105 ft (32 m) and a deck 49 ft wide.
Who owns Hardy Toll RD SB over UPRR & Hcfcd Ditch?
It is owned by the Local Toll Authority.