US Bridges

Fb Pkwy NB Conn over US 90A Ebfr/Fb Pkwy Nbfr

Good

Harris County, Texas · 0.1 MI S of US90A · Structure no. 121020TOL020304

Built
2005
20 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
1,860 ft
4 main spans
Daily traffic
5,000
2010 count
Owner
Toll Authority
Local Toll Authority

About this bridge

Fb Pkwy NB Conn over US 90A Ebfr/Fb Pkwy Nbfr is a steel continuous stringer/multi-beam or girder carrying Fb Pkwy NB Conn over US 90A Ebfr/Fb Pkwy Nbfr in Harris County, Texas. It was built in 2005, so it is 20 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,000 vehicles a day, projected to reach 6,000 by 2030. The structure is 1,860 ft (566.9 m) long and 39 ft wide.

CarriesFb Pkwy NB Conn
CrossesUS 90A Ebfr/Fb Pkwy Nbfr
Location0.1 MI S of US90A
StateTexas
Coordinates29.63996, -95.48151
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4 (+11 approach)
Design loadHS 20
Structure length1,860 ft (566.9 m)
Longest span185 ft (56.4 m)
Deck width39 ft (11.8 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,000 (2010)
Projected traffic6,000 by 2030
Trucks0%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Fb Pkwy NB Conn over US 90A Ebfr/Fb Pkwy Nbfr built?

It was built in 2005, making it 20 years old in 2025.

What condition is Fb Pkwy NB Conn over US 90A Ebfr/Fb Pkwy Nbfr in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Fb Pkwy NB Conn over US 90A Ebfr/Fb Pkwy Nbfr carry?

About 5,000 vehicles per day (2010 count).

How long is Fb Pkwy NB Conn over US 90A Ebfr/Fb Pkwy Nbfr?

The structure is 1,860 ft (566.9 m) long with a longest span of 185 ft (56.4 m) and a deck 39 ft wide.

Who owns Fb Pkwy NB Conn over US 90A Ebfr/Fb Pkwy Nbfr?

It is owned by the Local Toll Authority.