Hardy Toll Iah Con over Hcfcd P-155-00 Ditch
GoodHarris County, Texas · 0.7 MI E of Hardy Toll RD · Structure no. 121020TOL010105
- Built
- 2000
- 25 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 112 ft
- 1 main span
- Daily traffic
- 17,739
- 2023 count
- Owner
- Toll Authority
- Local Toll Authority
About this bridge
Hardy Toll Iah Con over Hcfcd P-155-00 Ditch is a prestressed concrete stringer/multi-beam or girder carrying Hardy Toll Iah Con over Hcfcd P-155-00 Ditch in Harris County, Texas. It was built in 2000, so it is 25 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 17,739 vehicles a day, roughly 3% of them trucks, projected to reach 10,000 by 2029. The structure is 112 ft (34.1 m) long and 80 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Hardy Toll Iah Con over Hcfcd P-155-00 Ditch built?
It was built in 2000, making it 25 years old in 2025.
What condition is Hardy Toll Iah Con over Hcfcd P-155-00 Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does Hardy Toll Iah Con over Hcfcd P-155-00 Ditch carry?
About 17,739 vehicles per day (2023 count), of which roughly 3% are trucks.
How long is Hardy Toll Iah Con over Hcfcd P-155-00 Ditch?
The structure is 112 ft (34.1 m) long with a longest span of 112 ft (34.1 m) and a deck 80 ft wide.
Who owns Hardy Toll Iah Con over Hcfcd P-155-00 Ditch?
It is owned by the Local Toll Authority.